More productive day today
Got the t-Rex installed. As the checca plate is quite soft (alloy) I used a peice of unit strut to spread the load across a greater area. Should do the trick.

Got all the gear in, I'm spewing my big tub wouldn't fit so I've now got two smaller buckets. Actually should work well when getting riding gear to the scrutineers.

The shelf at the front is a touch small for the containers of spares n bits so there straped in for now, I'll use a piece of 100x50 angle fixed in to stop then sliding off while in transit.

Wets fitted in nicely under the shelf, with my gear buckets and other stuff suit ect strapped to the lining, and some grip to the ramp.

I chucked the old tool box on the front for tie downs and any other crap.


Pretty much ready for a test on Friday.
Still need to get the lights sorted, buy a tool box that fits in nicely on the left rear, a latch for the side door and chuck a web site somewhere for the accountant.

But I'll give it a few outings 1st.




Sent from my iPhone using Tapatalk